Cover

TABLE OF CONTENTS

 

EXECUTIVE SUMMARY

Introduction

Environmental Monitoring and Audit Progress

Breaches of Action and Limit Levels

Construction Noise

Complaint Log

Notification of Summons and Successful Prosecutions

Reporting Changes

Future Key Issues

1      INTRODUCTION

Purpose of the report

Structure of the report

2      PROJECT INFORMATION

Background

Project Organization

Summary of Construction Works Undertaken During Reporting Month

Construction Programme

Status of Environmental Licences, Notifications and Permits

3      NOISE MONITORING

Monitoring Requirements

Monitoring Location

Monitoring Equipment

Monitoring Parameters, Frequency and Duration

Monitoring Methodology and QA/QC Procedures

Maintenance and Calibration

Results and Observations

Event and Action Plan

4      ENVIRONMENTAL SITE INSPECTION

Site Audits

Implementation Status of Environmental Mitigation Measures

Solid and Liquid Waste Management Status

5      ENVIRONMENTAL NON-CONFORMANCE

Summary of Exceedances

Summary of Environmental Non-Compliance

Summary of Environmental Complaint

Summary of Environmental Summon and Successful Prosecution

6      FUTURE KEY ISSUES

Key Issues in the Coming Month

Monitoring Schedule for the Next Month

Construction Programme for the Next Month

7      CONCLUSIONS AND RECOMMENDATIONS

Conclusions

Recommendations

 

 

LIST OF TABLES

 

Table I             Summary Table for Monitoring Activities in the Reporting Month

Table II            Summary Table for Events Recorded in the Reporting Month

Table 2.1          Key Contacts of the Contract

Table 2.2          Status of Environmental Licenses, Notifications and Permits

Table 3.1          Location for Noise Monitoring Locations

Table 3.2          Noise Monitoring Equipment

Table 3.3          Noise Monitoring Parameters, Duration and Frequency

Table 3.4          Summary Table of Noise Monitoring Results during the Reporting Month

Table 3.5          Observation at Noise Monitoring Stations

Table 4.1          Observations and Recommendations of Site Audit

Table 4.2          Photographic Records of Measures

 

 

LIST OF DRAWINGS

 

Drawing no. 60335576/C6/C00/1041     Site Layout Plan (Contract No. ND/2019/06)

 

 

LIST OF FIGURES

 

Figure 1   Location of Noise Monitoring Stations

 

 

LIST OF APPENDICES

 

Appendix A    Construction Programme

Appendix B    Action and Limit Levels

Appendix C    Copies of Calibration Certificates

Appendix D    Environmental Monitoring Schedules

Appendix E     Noise Monitoring Results

Appendix F     Weather Conditions

Appendix G    Event Action Plans

Appendix H    Summary of Exceedance

Appendix I      Site Audit Summary

Appendix J      Updated Environmental Mitigation Implementation Schedule

Appendix K    Waste Generation in the Reporting Month

Appendix L     Complaint Log

Appendix M    Summary of Successful Prosecutions